Streamline House
In 2016, the winner of the Alan King Award for Excellence in Architectural Technology was Streamline House. Brian Davies MCIAT and Mark Davies MCIAT of Arc Design look back at the project.
The client’s existing house was a thermally efficient 2000 standard timber frame dormer bungalow. The clients wanted planning permission to sub-divide their 1.1-acre site and construct a new modern ‘A’-rated house for themselves. Once planning permission had been granted, they would sell their existing house to finance the new build project.
Fortunately, the site was relatively level, however the intended location of the new house was very close to a fast-flowing stream with banking along the eastern boundary, which we took advantage of within our building design.
The brief was to design a unique modern art deco-influenced house as a retirement home. The house with its subtle curves takes advantage of the natural curvature of the stream whilst incorporating the soft sound of water rushing underneath the overhanging balcony, with a view towards an existing secret garden.
The internal ground floor accommodation includes a large open plan living/dining/kitchen space, utility room, separate lounge room and a spectacular curved staircase leading to the first floor. The first floor comprises of a master suite with access to the balcony overlooking the stream, three additional bedrooms, one with en suite and a family bathroom. It was important for our clients to have a uniquely designed house with an energy efficient building fabric and a renewable heating system giving low annual running costs.
As the design team, we evaluated the best approach to construct the building, which incorporated external curves with large areas of glazing, internal open plan layouts and cantilevered balconies. We decided to use an insulated concrete formwork (ICF) walling system, connected to reinforced concrete floors, balconies and curved feature staircase. All floors, balconies and staircase are finished in polished Italian marble. A full heat recovery system was concealed within the ceilings and connected to a heat exchanger unit.
It was essential for the house to achieve sustainable performance along with a comfortable all year round living environment. ICF construction provides a high level of thermal insulation and air tightness (air permeability rating resulting in excellent low annual energy running costs), by combining CFC/HCFC free insulation and concrete thermal mass, minimises temperature fluctuations by absorbing and storing heat. The complete building envelope is thermally designed to approximately 25% above the minimum Irish Building Regulation Standards.
The monolithic concrete building construction was designed to be extremely resilient to flood damage, and incorporated low maintenance components and finishes. Triple glazed AluClad windows and door units were fitted. The house is fitted with a sophisticated Mechanical Heat Recovery Ventilation System (MVHR) supplying fresh air to all habitable rooms. A sustainable electric solution for the heating and hot water was provided to work alongside the MVHR. A water source heat pump was located in the stream providing heat energy to the house all year round.
The hot water and under floor heating was provided via a water source heat pump with an open loop system using stream water which passes into an underground concrete holding tank to raise the temperature of water to the required minimum of eight degrees. Stream water enters the heat pump through the heat exchanger; the heat is removed and disbursed throughout the house through under floor heating pipes. The used water is then dumped back into the stream without any contamination, making the system environmentally friendly.
ICF walling system is seen to be the most user friendly, due to its innovative design, which increases speed of construction, reduces labour costs and provides the highest level of performance during and after construction. Purity of the external design was paramount so exposed external rainwater downpipes were eliminated. Drainage from the balconies were concealed within the vertical hollow structural steel supports.
The local stream water temperature was deemed ideal for using the water source heat pump providing sustainable efficient hot water and heating throughout the year. We incorporated the Amvic ICF system, awarded an A+ by the BRE under its Green Guide to Specification assessment scheme. The A+ demonstrated that the ICF system was one of the most environmental friendly and sustainable ways to build. A sustainable wood burning appliance was incorporated into the formal lounge and relaxation area.
The site is level and the building is fully accessible and compliant under the Irish Building Regulations. The external cantilevered balconies incorporate an adjustable raised pedestal system allowing occupants level access from the building interior.
This article was originally published in AT ed. 122.
--CIAT
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
OpenUSD possibilities: Look before you leap
Being ready for the OpenUSD solutions set to transform architecture and design.
Global Asbestos Awareness Week 2025
Highlighting the continuing threat to trades persons.
Retrofit of Buildings, a CIOB Technical Publication
Now available in Arabic and Chinese aswell as English.
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.